A Walk Through

I think it's time for a tour! After this weekend, I am feeling optimistic. The project is about to take a turn for the better, and the end of the major construction has almost near. Thus far, few hiccups have occurred, with a touch of compromise along the way. And with that, I will let you see what 11 weeks of hard work, labour and patience can get you....


Starting with the upstairs hallway. The wall was ripped
down in order to put insulation in the wall. Literally, it is
the plywood sheeting from the roof. NO insulation in this hallway,
until today (Insulation is now in!).

Clean master bedroom, ready for insulation and drywall!

Master bedroom.


Master bedroom


View from Master Bedroom. It's like a tree house up there!


View from Master bedroom entrance, which WAS the den
entrance. 



View in new den room. A closet added!


Small window in den to keep the room up to code!

Upper hallway. Striped bare. 


In the front foyer.

View in kitchen. Old windows have been replaced with
larger ones.

View of kitchen. Right hand door was the old door way, to be
covered with drywall. Notice the rough ins for the lighting.

New living room with doors and windows. Ready for drywall.

Brick wall is still kicking around! I fought for that one to stay!


New basement floor! The basement
is now clean and ready for some paint! Oh, and new stairs!

The plumbing in the back left corner is for a future bathroom. Something to consider;
If you are ripping up the concrete in your basement reno, consider future design that
may happen. It doesn't hurt to plan ahead!

New stairs are measured and hopefully will be here by
the end of the week!

Soon to be laundry room nook! (This is where I forgot a light. Oops!)

New foundation room. This will be my gym/craft studio for
messy projects!



Backyard is now at grade. Levelled out, and ready for grass
and landscaping (That will be for the spring!) 

Back yard.

Addition from the driveway. Siding soon to come!